First steps and expenses, 10kW solar power plant requirements

Since recently „the road to solar“ has changed. You could apply for a subsidy, get accepted and only then deal with technical side of things (electrical infrastructure, connection bandwidth to the grid etc. etc.), which was ok if you want to be 100% sure you’ll get the money from the government 🙂 But trends, greed and fear of missing out got the best of our society and there were A LOT of people with secured funding but no infra to connect the solar plant to – hence from this year you need to sort out your connections to the grid first and only when it’s approved – apply for a subsidy. This model is heaps better, at least for those, who really want and can install it.

I’ve done my research, did all calculations (based on today’s situation, I know something will change sooner than later) and opted to install solar power plant on my house roof. If you want to see what struggles I had starting this journey, how it’s going and first steps everyone in my area must take to make it happen – continue reading at my:

Contribee – https://contribee.com/geriaune/post/35820
Patreon – https://www.patreon.com/posts/first-steps-and-82689127
Substack – https://blog.geriaune.pro

If you want to drop me a beer: https://paypal.me/geriaune